Path: SC/MannedVehicle
% Sizes an Environmental Control and Life Support subsystem (ECLSS).
Has a demo comparing the three types.
--------------------------------------------------------------------------
Form:
p = ECLSSSizing( nCrew, nDays, type )
--------------------------------------------------------------------------
------
Inputs
------
nCrew (1,:) Number of crew
nDays (1,:) Number of days
type (1,:) 'open', 'closed', 'partially closed'
-------
Outputs
-------
p (1,1) Data structure
.PR (1,:) Power required (kW)
.WH (1,:) Waste heat generated (kW)
.SCM (1,:) Mass of spare parts and consumables (kg)
.SCV (1,:) Volume of spare parts and consumables (m^3)
.HWM (1,:) Mass of system hardware (kg)
.HWV (1,:) Volume of system hardware( m^3)
.TOTSM (1,:) Total system mass (kg)
.TOTSV (1,:) Total system volume (m^3)
.PI (1,:) Power impact penalty (kg)
.HI (1,:) Waste heat impact penalty (kg)
--------------------------------------------------------------------------
Reference: Miller, S., "Environmental Control and Life Support System"
--------------------------------------------------------------------------
Common: Graphics/Plot2D
Back to the SC Module page